Automatic Nonwoven Fabric Extrusion Lamination Coating Machine

Condition
Nouvelle

Power of Extruder Motor(kW)
18.5

Masse
5500kg

Number of Die
2

Dimension(L*W*H)
1300*800*250millimètre

Warranty of Core Components
1 Year

Tension
220/380V

Width of Die
1000

Marketing Type
Hot Product 2019

Packaging Material
Wood

Heating Power of Extruder(kW)
32

Applicable Industries
Manufacturing Plant

Total Power(kW)
60

Power of Driving Motor(kW)
7.5

Showroom Location
None

Marque déposée
ZD

Forfait transport
Wooden

Origine
Zhejiang, Chine

La description

Description du produit

Performance and characteristics

At present, this equipment is the most advanced nowith other non-woven bags sealed by ultrasonic heat, it is more solid and secure. It is more beautiful and texture is obvious. It can completely replace hand sewing non-woven flour bags,handbags and so on. The machine structure is folding of unwinding orifice, upper hand, sewing ofportable orifice (two sewing machines, two loop handle sealing machines), folding, punching,three-dimensional bag indentation, cutting, side sewing(two sewing machines), bag collection machine total power 15KW. The equipment full length eighteen meters and five meters wide.
Automatic Nonwoven Fabric Extrusion Lamination Coating Machine
TaperDiameter of extruder screwL/D ratio of screwNumber of DieWidth of DieTotal power(kw)Power of extruder motor(kw)Heating power of extruder(kw)Power of driving motor(kw)Installing Dimensions(millimètre)L*W*HMasse(approx)(kg)
ZD-FMF105/100010528:1210006018.5327.51300*800*2505500
ZD-FMF105/120010528:11/212009018.5357.51300*8800*2506000
ZD-FMF105/160012028:11160012022.5387.51300*1100*2507000

More quality product

Automatic Nonwoven Fabric Extrusion Lamination Coating Machine

Company introduction

Automatic Nonwoven Fabric Extrusion Lamination Coating Machine

Exposition

Automatic Nonwoven Fabric Extrusion Lamination Coating Machine

Certifica & Expédition

Automatic Nonwoven Fabric Extrusion Lamination Coating Machine

Contactez-nous

Automatic Nonwoven Fabric Extrusion Lamination Coating Machine

FAQ

1. How long will your engineer reach our factory?
Within one week after everything ready (machine arrival your factory, non woven material, power source, air compressor etc. Prepared)
2. How many days will you finish installing ?
We will finish installation and training within 15 journées.
3. What should we charge for your engineer?
You should charge for the cost of our engineer’s air tickets, hotel, food, and also their salary 80USD one day per person.
4. How long is your machine’s warranty period?
All our machine have one year guarantee for electricity parts and two years guarantee for mechanism, starting from finished installation.
5. How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.
6. How could you do after one year warranty period?
We also can do service for you, but you need pay salary for our technicians 80USD/day for each person.
7. Does your engineer understand English?
Our engineers understand a little English. All our engineers have more than five years machine installation experience.
8. Can you help us find any engineer in our location?
Of course, we will check and inform you as soon as possible.
9. How do we solve the machine problem after your engineer leaving?
En général, there will be no problem after finishing installation. In case you have any problem, you can contact our sales at any time. Our engineers will take a solution video according your description.